Oct 24, 2011
Bid Due Date November 16, 2011 at 1:00pm Bids by subcontractors must be received two (2) hours prior.
Aug 6, 2011
Bid date: 8/25/2011 Improvements to the existing wastewater pumping station. Download bid package documents below:
Aug 6, 2011
Bid Date: 9/15/2011 Improvements to the existing wastewater pumping station. Download bid package documents below:
Aug 6, 2011
Bid date: 9/1/2011 Renovate and upgrade existing station. Download bid package documents below:
Aug 6, 2011
Bid date: 8/18/2011 Improvements to the existing wastewater pumping station. Download bid documents below:
Aug 6, 2011
Bid Date: 8/25/2011 Replacement of existing 0.3 MG tank with new spheroidal 0.5 MG tank for additional water storage and fire protection. For bid documents download the files below: